NLM Digital Collections

Search

Search Constraints

Start Over You searched for: Subjects Ventilation Remove constraint Subjects: Ventilation Dates by Range 1900-1949 Remove constraint Dates by Range: 1900-1949

Search Results

4. First partial report on Project no. 45 -- physiological and operational characteristics of T26E3 tank

5. Final report on Project no. 45 -- operational and physiological characteristics of the tank T26E3, (M26): subject: the study of the proposed relocation of the 1000 CFM tank ventilating blower to the turret bulge

6. Project no. 2 -- High temperatures in tanks. Final report on sub-project no. 2-28, Test of individual crew conditioning system