NLM Digital Collections

Search

Search Constraints

Start Over You searched for: Subjects Weapons Remove constraint Subjects: Weapons

Search Results

2. Fourth partial report on Project no. 37 -- study of errors in field artillery practice: subject: an analysis of the sources of error in the use of the aiming circle and development of an improved instrument

11. Third partial report on Project no. 37 -- study of errors in field artillery practice: subject: analysis of requirements for eliminating errors in laying guns in elevation

16. First partial report on Project no. 45 -- physiological and operational characteristics of T26E3 tank

17. Second partial report on Project no. 45 -- operation and physiological characteristics of the tank T26E3: subject: the physiological work rates of the driver and loader in the tank T26E3 in relation to fatigue and efficiency of performances

18. Final report on Project no. 45 -- operational and physiological characteristics of the tank T26E3, (M26): subject: the study of the proposed relocation of the 1000 CFM tank ventilating blower to the turret bulge

19. Second partial report on Project no. 37 -- study of errors in field artillery practice: subject: an analysis of the sources of error in the use of the panoramic telescope M12 and development of principles of design for an improved instrument

28. Project no. 3 -- Toxic gases in armored vehicles. Partial report on sub-project no. 3-9 -- Determination of the ventilation requirements for gas-proofing tanks : ventilation requirements for gas-proofing the M-5 tank

29. Project no. 3 -- Toxic gases in armored vehicles. Partial report on sub-project no. 3-9, Determination of the ventilation requirements for gas-proofing tanks : subject: ventilation requirements for gas-proofing tanks of the M-4 series

30. Project no. 3 -- Toxic gases in armored vehicles. Second partial report on sub-project no. 3-9 -- Determination of ventilation requirements for gas-proofing tanks of the M4 series

31. Project no. 3 -- Toxic gases in armored vehicles. Final report on sub-project no. 3-13 -- Determination of the characteristics and effects upon the crew of gun fumes from firing of the weapons in the M7 tank

32. Project no. 3 -- Toxic gases in armored vehicles. Final report on sub-project no. 3-15 -- Determination of the characteristics and effects upon the crew of gun fumes from firing of the weapons in the M4A4E1 tank

33. Project no. 3 -- Toxic gases in armored vehicles. First partial report on sub-project no. 3-4 -- Determination of basic ventilation characteristics of tanks of the M4 series : sub-project no. 3-6 -- Determination of basic ventilation characteristics of tanks of the M5 series

34. Project no. 3 -- Toxic gases in armored vehicles. Final report on sub-project no. 3-2 -- Determination of the characteristics and effects upon the crew of gun fumes from firing of the weapons in tanks of the M5 series

36. Project no. 3 -- Toxic gases in armored vehicles. Supplement report on sub-project 3-1 -- Determination of the characteristics and effects upon the crew of gun fumes from firing of the weapons in tanks of the M4 series : sub-project 3-5 -- Correlation of basic ventilation data with gun fume studies and devalopment for the control of gun fumes in the M4 tanks : subject -- Control of gun fumes in M4 series medium tanks by positive-pressure ventilation

38. The knives in the case