NLM Digital Collections

Search

Search Constraints

Start Over You searched for: Subjects United States Remove constraint Subjects: United States Subjects Ventilation Remove constraint Subjects: Ventilation Dates by Range 1900-1949 Remove constraint Dates by Range: 1900-1949

Search Results

3. First partial report on Project no. 45 -- physiological and operational characteristics of T26E3 tank

4. Final report on Project no. 45 -- operational and physiological characteristics of the tank T26E3, (M26): subject: the study of the proposed relocation of the 1000 CFM tank ventilating blower to the turret bulge

5. Project no. 2 -- High temperatures in tanks. Final report on sub-project no. 2-28, Test of individual crew conditioning system

7. Project no. 3 -- Toxic gases in armored vehicles. Supplemental report on sub-project no. 3-12 -- The carbon monoxide hazard from auxiliary generators in tanks

8. Project no. 3 -- Toxic gases in armored vehicles. Partial report on sub-project no. 3-9 -- Determination of the ventilation requirements for gas-proofing tanks : ventilation requirements for gas-proofing the M-5 tank

9. Project no. 3 -- Toxic gases in armored vehicles. Partial report on sub-project no. 3-9, Determination of the ventilation requirements for gas-proofing tanks : subject: ventilation requirements for gas-proofing tanks of the M-4 series

10. Project no. 3 -- Toxic gases in armored vehicles. Second partial report on sub-project no. 3-9 -- Determination of ventilation requirements for gas-proofing tanks of the M4 series